Sunday, December 17, 2006

We Have Walls and Snow...


Last week the concrete basement walls were poured and then the snow returned. I don't think we have to worry about our concrete setting too quickly in this kind of weather. It's pretty exciting to see the defined space even if it is still open to the snow. Next steps are to set the window wells, dig out for the floor, get the plumbing roughed in, and backfill against the walls.

Tuesday, December 05, 2006

Concrete Forms Getting Placed



I'm continually surprised as to how long construction takes. You see a shopping mall go up in what seems like a week, but I guess it would feel differently if you lived there. We are a month into the construction of this addition and we now have foundation footings. The silver lining here is that the longer it takes the more time we have to save some extra money to actually insulate the box we're going to be left with! Over the last two days we have had a crew out placing the basement wall forms, and today the first ones have been set. It looks like all the materials are here to set the rest of them so we may be ready to pour in the next couple of days.

Wednesday, November 22, 2006

Still Digging...



We're currently in the phase of construction that you see people doing stuff, but it just all still just kinda looks the same. We now have most of our footings dug and I hear that those will be poured in this week. Although with the holiday who knows. We do have a re-routed sewer line that required removing about 5' x 5' chunk of driveway, but that could have been a lot worse. I hadn't really thought about our sprinklers through this process, but that is going to be a lot of work to re-run all the lines that have been demolished during the digging. We still have a ton of dirt in the yard but most of it will be used to backfill the concrete forms. So it boils down to...we still have a mess.